Stormtech waterdrops
Downloads
Homeowners Regulators Developers Contractors Engineers
 
Home
About Us
Overview
LEED
Software Partners
Products
Overview
MC-4500 Chamber
MC-3500 Chamber
SC-740 Chamber
SC-310 Chamber
MC-4500 Endcaps
MC-3500 Endcaps
SC-310/740 Endcaps
DC-780 Chamber
Resources
Overview
Site Calculator
Manuals & Tech Sheets
Accept. Fill Materials
Accept. Geotextiles
AASHTO/ASTM
Industry Links
Case Studies
Overview
CS: Infiltration
CS: Renovation
CS: Playing Field
CS: Dimensions
Low Impact Dev.
Sediment Removal
FAQ
Contact Us

StormTech
A Division of ADS, Inc.

70 Inwood Road
Suite 3
Rocky Hill, CT 06067

(P) 888-892-2694
(F) 866-328-8401

Canada Français
1-888-367-7473

StormTech
A Division of
ADS Europe B.V.
+31 (0)10-299-6410


StormTech International

info@stormtech.com
 

Acceptable Fill Materials

SC-Series

Material Location Description

AASHTO
M43
Designation
(1)

Compaction/
Density
Requirement
D Fill material for layer D starts from the top of layer C to the bottom of flexible pavement or unpaved finish grade above. Note that pavement sub-base may be part of the D layer. Any soil/rock materials, native soils, or per engineer's plans. Check plans for pavement subgrade requirements. N/A Prepare per engineer's plans. Paved installations may have stringent material and preparation requirements.
C Fill material for layer C starts from the embedment stone (B layer) to 18" (457 mm) above the top of the chamber. Note that pavement sub-base may be part of the C layer. Granular well-graded soil/aggregate mixtures, <35% fines. Most pavement sub-base materials can be used in lieu of this layer. 3, 357, 4, 467, 5, 56, 57, 6, 67, 68, 7, 78, 8, 89, 9, 10 Begin compaction after 12" (305 mm) of material over the chambers is reached. Compact additional layers in 6" (152 mm) lifts to a minimum 95% standard proctor density. (2) Roller gross vehicle weight not to exceed 12,000 lbs. (53 kN). Dynamic force not to exceed 20,000 lbs. (89 kN).
B Embedment stone surrounding chambers from the foundation stone to the C layer above. Clean, crushed, angular stone, nominal size distribution between 3/4" - 2" (19 mm -51 mm) 3, 357, 4, 467, 5, 56, 57 No compaction required.
A Foundation stone below chambers from subgrade up to the foot (bottom) of the chamber. Clean, crushed, angular stone, nominal size distribution between 3/4" - 2" (19 mm - 51 mm) 3, 357, 4, 467, 5, 56, 57 Plate compact or roll to achieve a 95% standard proctor density.(2)

Please note:

1. The listed AASHTO designations are for gradations only. The stone must also be clean, crushed, angular. For example, a specification for #4 stone would state: "Clean, crushed, angular No. 4 (AASHTO M43) stone."

2. As an alternative to proctor testing and field density measurements in the 'A' location, StormTech compaction requirements are met for 'A' location materials when placed and compacted in 9" (229) (max) lifts using two full passes with an appropriate compactor.


MC-Series

Material Location Description

AASHTO
M43
Designation
(1)

Compaction/
Density
Requirement
D Fill material for layer D starts from the top of layer C to the bottom of flexible pavement or unpaved finish grade above. Note that pavement sub-base may be part of the D layer. Any soil/rock materials, native soils, or per engineer's plans. Check plans for pavement subgrade requirements. N/A Prepare per engineer's plans. Paved installations may have stringent material and preparation requirements.
C Fill material for layer C starts from the embedment stone (B layer) to 24" (610 mm) above the top of the chamber. Note that pavement sub-base may be part of the C layer. Granular well-graded soil/aggregate mixtures, <35% fines. Most pavement sub-base materials can be used in lieu of this layer. (AASHTO M145 A-1, A-2, A-3) 3, 357, 4, 467, 5, 56, 57, 6, 67, 68, 7, 78, 8, 89, 9, 10 Begin compaction after min 24" (610 mm) of material over the chambers is reached. Compact additional layers in 12" (305 mm) lifts to a minimum 95% standard proctor density. (see Tables 2 and 3 of the MC-3500 / MC4500 Construction Guide for maximum roller loads)
B Embedment stone surrounding chambers from the foundation stone to the C layer above. Clean, crushed, angular stone, nominal size distribution 3/4" - 2" (19 mm -51 mm) 3, 4 No compaction required.
A Foundation stone below chambers from subgrade up to the foot (bottom) of the chamber. Clean, crushed, angular stone, nominal size distribution 3/4" - 2" (19 mm - 51 mm) 3, 4 Plate compact or roll to achieve a 95% standard proctor density.(2)

Please note:

1. The listed AASHTO designations are for gradations only. The stone must also be clean, crushed, angular. For example, a specification for #4 stone would state: "Clean, crushed, angular No. 4 (AASHTO M43) stone."

2. As an alternative to proctor testing and field density measurements in the 'A' location, StormTech compaction requirements are met for 'A' location materials when placed and compacted in 9" (229) (max) lifts using two full passes with an appropriate compactor.

 

 

StormTech... We Make Land Work for You


Developers | Contractors | Engineers | Regulators | Homeowners
About Us | Products | Resources | Markets | Downloads | Contact Us

StormTech International

Copyright© 2012 StormTech, A Division of ADS, Inc., 70 Inwood Road, Suite 3, Rocky Hill, Connecticut 06067